The room is painted as is the cement floor and the carpenters have started to install shelves.
The pantry should look pretty much like this when it is completed.
My floor is in the process of being sanded. This is the old cement floor which is wavy, cracked and also less than level. Once it is sanded, they will fill the cracks and then paint it. I've always wanted a cement floor that I can just hose down if necessary. I installed brass drains and i have a water faucet on the other side of that gray door so I can hook up a hose. I don't know that I will actually ever have to hose it down but everything is in place if I need to. And surprise surprise, my foreman quit the company last week, great timing! He and I have been planning and measuring and working together for 6 months and now he is gone. I have a brand new guy coming next week. Just shoot me now!
Oh, and just to remind you, this is a pic of the basement 6 months ago:
Comments
I threatened to put a drain in the kitchen floor so I could hose it off after my kids made messes.
Have a great day!
Christer.